Southwest Airlines Hangar Expansion
Hensel Phelps
About this Project
K CORP furnished and installed sanitary waste, indirect waste, storm drain, domestic water, non-potable water, compressed air, natural gas and hydraulic oils for related work stations, air outlets, air compressors, booster pumps, paint booths, floor drains, roof drains and fixtures. K CORP modeled and prefabricated the horizontal water and compressed air piping mains on a single Unistrut support system.
![](http://karbercorporation.com/wp-content/uploads/2019/11/SW-Hangar.jpg)
![](http://karbercorporation.com/wp-content/uploads/2019/12/SWAHE-1.jpg)
![](http://karbercorporation.com/wp-content/uploads/2019/12/SWAHE-2.jpg)